New York
The dataset's own page. Dibsline holds its permits issued from 10 Sep 2026.
Licence: not named by the source; its notice below is required with the data.
Nearly all of a day's permits are in 3 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: NYC Department of Buildings, "DOB NOW: Build - Approved Permits", NYC Open Data dataset rbx6-tga4, as of the time of the data. Changed by Dibsline: one record per work permit at its first issue (renewals left out), rows for the same work permit merged, values cleaned and trade tags added.
Chicago
The dataset's own page. Dibsline holds its permits issued from 10 Sep 2026.
Licence: not named by the source; its notice below is required with the data.
Nearly all of a day's permits are in 2 days after it (measured 29 Oct 2026).
Notice, shown with every result: This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one's own risk.
Philadelphia
The dataset's own page. Dibsline holds its permits issued from 10 Sep 2026.
Licence: Provided by the City of Philadelphia as is, without warranty of any kind.
Nearly all of a day's permits are in 3 days after it (measured 29 Oct 2026).
Notice, shown with every result: Provided by the City of Philadelphia as is, without warranty of any kind. Source: City of Philadelphia permits data (phl.carto.com, table permits).
Fort Worth
The dataset's own page. Dibsline holds its permits issued from 10 Sep 2026.
Licence: CC BY 4.0.
Nearly all of a day's permits are in 5 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of Fort Worth Development Services Department, Development Permits. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Changed by Dibsline: values cleaned and trade tags added.
Austin
The dataset's own page. Dibsline holds its permits issued from 10 Sep 2026.
Licence: not named by the source; its notice below is required with the data.
Nearly all of a day's permits are in 2 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of Austin, "Issued Construction Permits" (data.austintexas.gov dataset 3syk-w9eu).
City of Miami (Miami)
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: CC BY 4.0.
Nearly all of a day's permits are in 2 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of Miami, Department of Innovation and Technology, GIS Team, "Building Permits Since 2014" (https://www.arcgis.com/home/item.html?id=1d6fc60b087c4bcaa22345f429a2ec5a). Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Changed by Dibsline: values cleaned, ZIP codes found from the permit's location with Miami-Dade County's ZIP code boundaries, and trade tags added.
Miami-Dade County (Miami)
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: Provided by Miami-Dade County for use "as is".
Nearly all of a day's permits are in 3 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: Miami-Dade County, "Building Permits Issued By Miami-Dade County" (https://www.arcgis.com/home/item.html?id=6db5f56e886446df88313ca279e59120). ZIP codes found by Dibsline from the permit's folio number in the County's Property Point View. Miami-Dade County provides this data for use "as is". The areas depicted by this map/data are approximate, and are not accurate to surveying or engineering standards. The maps/data shown here are for illustration purposes only and are not suitable for site-specific decision making. Information found here should not be used for making financial or any other commitments. Miami-Dade County provides this information with the understanding that it is not guaranteed to be accurate, correct or complete and conclusions drawn from such information are the sole responsibility of the user. While every effort has been made to ensure the accuracy, correctness and timeliness of materials presented, Miami-Dade County assumes no responsibility for errors or omissions, even if Miami-Dade County is advised of the possibility of such damage.
San Diego
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: Open Data Commons Public Domain Dedication and License.
Nearly all of a day's permits are in 4 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of San Diego Development Services, "Approvals for development projects" (data.sandiego.gov), under the Open Data Commons Public Domain Dedication and License. Changed by Dibsline: non-building approvals left out, values cleaned and trade tags added. Where the address has no ZIP code, Dibsline finds it from the permit's location with the US Census Bureau's 2020 ZIP Code Tabulation Areas, which approximate ZIP codes (source: U.S. Census Bureau).
San Jose
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: CC0.
Nearly all of a day's permits are in 4 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of San Jose, "Last 30 days building permits" (data.sanjoseca.gov), CC0. Changed by Dibsline: values cleaned and trade tags added.
Boston
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: Open Data Commons Public Domain Dedication and License.
Nearly all of a day's permits are in 4 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of Boston, Inspectional Services Department, "Approved Building Permits" (Analyze Boston, data.boston.gov), under the Open Data Commons Public Domain Dedication and License. Changed by Dibsline: certificates of occupancy left out, values cleaned and trade tags added.
Minneapolis
The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.
Licence: CC0.
Nearly all of a day's permits are in 3 days after it (measured 29 Oct 2026).
Notice, shown with every result: Source: City of Minneapolis, Construction Code Services, "CCS_Permits" (opendata.minneapolismn.gov), CC0. Changed by Dibsline: rows for the same permit merged, values cleaned, ZIP codes found from the permit's location with Hennepin County's ZIP code boundaries, and trade tags added.