Dibsline Permits: Miami, FL

New building permits in Miami, every day

Every building permit Miami issues, as the city publishes it, in your AI assistant: tagged by trade, with the job value, ZIP code and contractor where the city gives them, and a link to the city's own record. Ask in plain English; filter by trade, job value, ZIP code and contractor.

Free plan: 10 results a week, no card. Permits Pro $49 USD a month per city, no weekly limit; Permits All Cities $99 USD a month.

What you get

  • Permits issued in Miami from 19 Sep 2026 on, collected every day at 20:15 UTC.
  • Tagged by trade: pool, roof, solar, remodel, new home, addition, HVAC, electrical, plumbing, demolition, fence and sign.
  • One line per job when you ask for leads or jobs: the permits at one address, counted once.
  • On a paid plan, a saved search emails you what is new once a day.
  • Miami means two sources: the permits the City of Miami issues and the permits Miami-Dade County issues, each permit saying which. Other cities in the county that issue their own permits, such as Miami Beach or Hialeah, are not included.
  • The City of Miami publishes no ZIP code: Dibsline finds it from the permit's location. Miami-Dade County publishes none either: Dibsline finds it from the permit's folio number in the County's property data.

Live counts for Miami

permits in the last 7 days
1,638
permits in the last 30 days
8,279

By trade

Miami permits by trade
TradeLast 7 daysLast 30 days
Electrical3411,787
Remodel3381,677
Other2761,358
Roof2311,120
Plumbing184906
HVAC127704
Pool108517
Fence79405
New home42181
Addition38176
Demolition29144
Sign21123
Solar1369

A permit tagged with two trades counts in both.

Busiest ZIP codes, last 30 days

Miami busiest ZIP codes
ZIP codePermits
33133355
33127301
33142278
33137265
33177252

Counted by Dibsline at 2 Nov 2026, 21:45 UTC, for 27 Oct to 2 Nov 2026 (7 days) and 4 Oct to 2 Nov 2026 (30 days). Counted again every 6 hours. City of Miami's permits are nearly all in to 31 Oct and Miami-Dade County's to 30 Oct; the days after are still arriving.

Two things to ask

Roof permits in Miami this week, City and County

How many solar permits did Miami issue in the last 30 days, by ZIP code?

Every answer gives the total, the newest permits first, the city's notice and the link to each permit's record. 7 worked examples with real counts

The source, its licence and its notice

City of Miami (Miami)

The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.

Licence: CC BY 4.0.

Nearly all of a day's permits are in 2 days after it (measured 29 Oct 2026).

Notice, shown with every result: Source: City of Miami, Department of Innovation and Technology, GIS Team, "Building Permits Since 2014" (https://www.arcgis.com/home/item.html?id=1d6fc60b087c4bcaa22345f429a2ec5a). Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Changed by Dibsline: values cleaned, ZIP codes found from the permit's location with Miami-Dade County's ZIP code boundaries, and trade tags added.

Miami-Dade County (Miami)

The dataset's own page. Dibsline holds its permits issued from 19 Sep 2026.

Licence: Provided by Miami-Dade County for use "as is".

Nearly all of a day's permits are in 3 days after it (measured 29 Oct 2026).

Notice, shown with every result: Source: Miami-Dade County, "Building Permits Issued By Miami-Dade County" (https://www.arcgis.com/home/item.html?id=6db5f56e886446df88313ca279e59120). ZIP codes found by Dibsline from the permit's folio number in the County's Property Point View. Miami-Dade County provides this data for use "as is". The areas depicted by this map/data are approximate, and are not accurate to surveying or engineering standards. The maps/data shown here are for illustration purposes only and are not suitable for site-specific decision making. Information found here should not be used for making financial or any other commitments. Miami-Dade County provides this information with the understanding that it is not guaranteed to be accurate, correct or complete and conclusions drawn from such information are the sole responsibility of the user. While every effort has been made to ensure the accuracy, correctness and timeliness of materials presented, Miami-Dade County assumes no responsibility for errors or omissions, even if Miami-Dade County is advised of the possibility of such damage.

How fresh it is. Miami publishes a permit a day or more after it is issued, and some days fill in over several days. The live counts above say which days are still arriving, and so does every answer; the status page shows the newest collection and record.

Dibsline is not affiliated with the city. It never calls or texts anyone; the Do Not Call, TCPA and CAN-SPAM rules apply to you.

More